Tailoring is necessary because each project is unique; not every process, tool, technique, input, or output Identified in the PMBOK® Guide is required on every project. Tailoring should address the competing constraints of scope, schedule, cost, resources, quality, and risk.
The importance of each constraint is different for each project, and the project manager tailors the approach for managing these constraints based on the project environment, organizational culture, stakeholder needs, and
other variables.
In tailoring project management, the project manager should also consider the varying levels of governance that may be required and within which the project will operate, as well as considering the culture of the organization. In addition, consideration of whether the customer of the project is internal or external to the organization may affect project management tailoring decisions.
But since tailoring requires significant project management experience and knowledge, tailoring the
project to suit a project manager’s skill set is likely to be uncommon .
How Artificial intelligence (AI) can optimize bridges design? Introduction: Bridges are important pieces of infrastructure that connect communities and…
How AI can help in Highways and Railways design? Introduction: Artificial Intelligence (AI) has emerged as a transformative…
Enhancing Road Modeling Efficiency : Leveraging ChatGPT with Civil3D Introduction: Road modeling is a critical component of civil engineering and…
What are Stirrups and Why we Use Them? Steel reinforcement is an essential component of reinforced concrete, providing tensile…
Why Are Spiral Curves Important? Benefits And Elements Of Spiral Curve 1. Introduction: Spiral curves are an important…
The Main Types Of Tunnels Tunnels have been used for various purposes throughout history, from transportation and infrastructure to…
This website uses cookies.