Resources and Topics

What are the differences between Primavera vs MS-Project

What are the differences between Primavera vs MS-Project

 

Primavera Oracle and Microsoft Project are the most commonly used softwares packages for Scheduling and Controlling in Construction and Development Projects.

P6 is by far more suited for a multi-user, large corporate project structure, particularly where most projects are part of a larger project, or an ongoing corporate management strategy that integrates projects in a networked system, particularly with a lot of shared resources. The three major downsides to P6 are the sharp learning curve, the need for a system administrator, and the overall and ongoing cost.

MS Project is more suited for independent projects, smaller corporations with less projects, a corporate management strategy that separates projects from the business management system, and projects that are largely dependent on external resources. The downsides to Project are the difficulties in integrating multiple resource-related or otherwise multi-level projects, and creating and integrating resource-dependent scheduling and auto-leveling.

These are the main factors that should be considered when selecting your Project Management software.

Below are listed the 13 main differences between Primavera and MS-Project:

 

To download Free Project Management Templates you can visit www.managementproject.net

The Engineering Community

Recent Posts

How Artificial intelligence (AI) can optimize bridges design?

How Artificial intelligence (AI) can optimize bridges design? Introduction:   Bridges are important pieces of infrastructure that connect communities and…

7 months ago

How AI can help in Highways and Railways design?

How AI can help in Highways and Railways design?   Introduction:   Artificial Intelligence (AI) has emerged as a transformative…

7 months ago

Enhancing Road Modeling Efficiency : Leveraging ChatGPT with Civil3D

Enhancing Road Modeling Efficiency : Leveraging ChatGPT with Civil3D Introduction: Road modeling is a critical component of civil engineering and…

11 months ago

What are Stirrups and Why we Use Them?

What are Stirrups and Why we Use Them?   Steel reinforcement is an essential component of reinforced concrete, providing tensile…

1 year ago

Why Are Spiral Curves Important? Benefits And Elements Of Spiral Curve

Why Are Spiral Curves Important? Benefits And Elements Of Spiral Curve   1. Introduction:   Spiral curves are an important…

1 year ago

The Main Types Of Tunnels

The Main Types Of Tunnels   Tunnels have been used for various purposes throughout history, from transportation and infrastructure to…

1 year ago

This website uses cookies.