NEWS

Renzo piano reveals plans for genoa bridge reconstruction

Renzo piano reveals plans for genoa bridge reconstruction

 

Following the deadly collapse of genoa’s morandi bridge in august 2018, italian architect renzo piano had announced plans to donate a replacement design. on december 18, 2018, genoa mayor mario bucci announced that the project will take 12 months to complete once the site has been prepared. mayor bucci, the commissioner overseeing the reconstruction, also announced the selection of salini impregilo and fincantieri infrastructure, via a new company called PERGENOVA, for the construction of the bridge according to renzo piano’s design.

 

Piano comments on the spirit of the redesign: ‘the new bridge will have to be simple and parsimonious, but not trivial. it will look like a ship moored in the valley; a light and bright steel bridge. it will reflect the sunlight during the day and absorb solar energy to return it at night. it will be a sober bridge, respecting the character of the genoese.

The continuous steel deck will extend 1,100 meters across genoa’s polcevera river all images courtesy of renzo piano building workshop

Situated along italy’s northwestern coast, genoa is the sixth largest city in the country. the bridge serves as an essential element that will allow genoa to reclaim its role as a great port and trade city. the bridge is an important junction connecting the city with france, the port and, generally, with nearby areas. renzo piano building workshopdesigned the bridge with a continuous steel deck extending 1,100 meters (3,609 ft) with 20 spans. the 19 elliptical piers of reinforced concrete will be primarily positioned at 50 meter increments, although because of their location on the river and the railway, two of these piers will be 100 meters apart. construction will be led by collaborating companies, salini impregilo and fincantieri.

Salini impregilo and fincantieri will work together by creating a new company called PERGENOVAThe bridge over the polcevera is a key artery connecting the port and the wider coastal area to france

Public works are expected to kickstart the economy and begin to create jobs again

The bridge will reflect the sunlight during the day and absorb solar energy to return it at night

The project foresees completion 12 months from the moment work begins

The Engineering Community

Recent Posts

How Artificial intelligence (AI) can optimize bridges design?

How Artificial intelligence (AI) can optimize bridges design? Introduction:   Bridges are important pieces of infrastructure that connect communities and…

7 months ago

How AI can help in Highways and Railways design?

How AI can help in Highways and Railways design?   Introduction:   Artificial Intelligence (AI) has emerged as a transformative…

7 months ago

Enhancing Road Modeling Efficiency : Leveraging ChatGPT with Civil3D

Enhancing Road Modeling Efficiency : Leveraging ChatGPT with Civil3D Introduction: Road modeling is a critical component of civil engineering and…

11 months ago

What are Stirrups and Why we Use Them?

What are Stirrups and Why we Use Them?   Steel reinforcement is an essential component of reinforced concrete, providing tensile…

1 year ago

Why Are Spiral Curves Important? Benefits And Elements Of Spiral Curve

Why Are Spiral Curves Important? Benefits And Elements Of Spiral Curve   1. Introduction:   Spiral curves are an important…

1 year ago

The Main Types Of Tunnels

The Main Types Of Tunnels   Tunnels have been used for various purposes throughout history, from transportation and infrastructure to…

1 year ago

This website uses cookies.