Overview

The innovative and revolutionary new ETABS is the ultimate integrated software package for the structural analysis and design of buildings.

Incorporating 40 years of continuous research and development, this latest ETABS offers unmatched :

  •  3D object based modeling and visualization tools,
  • Blazingly fast linear and nonlinear analytical power,
  • Sophisticated and comprehensive design capabilities for a wide-range of materials, and insightful graphic displays,
  • Reports, and schematic drawings that allow users to quickly and easily decipher and understand analysis and design results.

From the start of design conception through the production of schematic drawings, ETABS integrates every aspect of the engineering design process.

Creation of models has never been easier – intuitive drawing commands allow for the rapid generation of floor and elevation framing.

CAD drawings can be converted directly into ETABS models or used as templates onto which ETABS objects may be overlaid.

The state-of-the-art SAPFire 64-bit solver allows extremely large and complex models to be rapidly analyzed,and supports nonlinear modeling techniques such as construction sequencing and time effects (e.g., creep and shrinkage).