Skip to the content
  • About us
  • Disclaimer
  • Contact us
The Engineering Community

The Engineering Community

Share to Learn

  • HOME
  • STORIES
    • NEWS
    • INNOVATION
    • HOW-TO
  • ARTICLES
    • CAD & BIM
    • CIVIL ENGINEERING
      • CONSTRUCTION
      • GEOTECHNICAL
      • HIGHWAYS
      • RAILWAYS
      • SURVEYING
    • MECHANICAL ENGINEERING
  • PROJECT MANAGEMENT
    • RESOURCES AND TOPICS
    • PMP EXAM
    • FREE PMP EXAM SIMULATOR
    • PMP Qs & As
    • PMI-ACP EXAM
    • RMP – PMI EXAM
    • PRINCE2 Foundation EXAM
  • BOOKS
    • Civil engineering
      • English Books & Notes
      • Codes
      • Structural
      • Reinforced Concrete
      • Prestressed Concrete
      • Seismic
      • Steel
      • Bridges
      • Hydraulic
      • Topography
      • Geotechnical
      • Foundation
      • Tunnels
      • Roads and Highways
      • AIRPORTS
    • Electrical engineering
    • Mechanical engineering
    • Dynamic and earthquake
    • Marine
    • Project Management
  • RESOURCES
    • Civil Engineering PowerPoint Presentations
    • Softwares Videos Tutorials
      • Robot Structural Analysis Professional
      • ETABS
    • Softwares ebooks Tutorials
    • Drawings and 3D Models
    • Autodesk Products
    • Bentley Products
    • CSI Products
  • SPREADSHEETS
    • Concrete Spreadsheets
    • Steel Spreadsheets
    • Structures Spreadsheets
    • Seismic Spreadsheets
    • Hydraulic Spreadsheets
    • Wind Calculations Spreadsheet
    • Geotechnical Spreadsheets
    • Roads & Highways Spreadsheets
    • Drilling Spreadsheets
Introduction of Building Information Modeling (BIM) Technologies in Construction
22 August 2018 Off

Introduction of Building Information Modeling (BIM) Technologies in Construction

By The Engineering Community

Introduction of Building Information Modeling (BIM) Technologies in Construction   1. Introduction BIM (Building Information Modeling) — information modeling of…

Pavement Defects and Failures You Should Know!
16 August 2018 Off

Pavement Defects and Failures You Should Know!

By The Engineering Community

Pavement Defects and Failures You Should Know!   Pavement deterioration is the process by which distress (defects) develop in the…

Morandi is the fifth bridge to collapse in Italy in five years
16 August 2018 Off

Morandi is the fifth bridge to collapse in Italy in five years

By The Engineering Community

Morandi is the fifth bridge to collapse in Italy in five years   Photos from Google Maps taken two years…

What we know about Genoa bridge that collapsed
15 August 2018 Off

What we know about Genoa bridge that collapsed

By The Engineering Community

What we know about Genoa bridge that collapsed   The Monrandi bridge in Genoa, Italy is part of the A10…

Autodesk Roadway Design for InfraWorks 360 Essentials
10 August 2018 Off

Autodesk Roadway Design for InfraWorks 360 Essentials

By The Engineering Community

Autodesk Roadway Design for InfraWorks 360 Essentials Autodesk Roadway Design for InfraWorks 360 Essentials, 2nd Edition allows you to begin…

Autodesk InfraWorks and InfraWorks 360 Essentials: Autodesk Official Press
10 August 2018 Off

Autodesk InfraWorks and InfraWorks 360 Essentials: Autodesk Official Press

By The Engineering Community

Autodesk InfraWorks and InfraWorks 360 Essentials: Autodesk Official Press Your guide to quickly learning InfraWorks Autodesk InfraWorks Essentials is a…

Tekla Structures for reinforced concrete Tutorial
10 August 2018 Off

Tekla Structures for reinforced concrete Tutorial

By The Engineering Community

Tekla Structures for reinforced concrete Tutorial   Tekla BIM software is revolutionising the concrete detailing process, enabling users to produce…

Up and Running with Civil 3D
10 August 2018 Off

Up and Running with Civil 3D

By The Engineering Community

Up and Running with Civil 3D   Great engineering projects begin with Civil 3D. Learn to get up and running…

China finalises design of 135km Taiwan rail tunnel
10 August 2018 Off

China finalises design of 135km Taiwan rail tunnel

By The Engineering Community

China finalises design of 135km Taiwan rail tunnel   Chinese engineers have finalised a method for building the world’s longest…

Virgin Hyperloop announces $500m testing centre in Andalucia
10 August 2018 Off

Virgin Hyperloop announces $500m testing centre in Andalucia

By The Engineering Community

Virgin Hyperloop announces $500m testing centre in Andalucia   Virgin Hyperloop One has signed an agreement with Spain to build…

Posts pagination

Previous 1 … 184 185 186 … 209 Next

Most Viewed Posts

  • Engineering Spreadsheets (80,799)
  • Concrete Box Culvert analysis and Design Spreadsheet (71,476)
  • Structural Design Of Single Cell Box Culvert Spreadsheet (58,132)
  • Russia-Japan railway bridge would let you travel from London to Tokyo (54,156)
  • Top 10 Civil Engineering Blogs (34,363)

Popular posts

Road, Highway & Railway Drainage Design Guide: Open Channels (Types, Slopes, Dimensions, and Key Formulas)

Road, Highway & Railway Drainage Design Guide: Open Channels (Types, Slopes, Dimensions, and Key Formulas)

1 February 2026 Off
The Behaviour and Design of Steel Structures to EC3 – Book Review

The Behaviour and Design of Steel Structures to EC3 – Book Review

5 November 2017 Off
New coastal highway route for Reunion

New coastal highway route for Reunion

29 October 2017 Off
Two Hyperloop Routes Look To Address India’s Overburdened Transport Networks

Two Hyperloop Routes Look To Address India’s Overburdened Transport Networks

5 October 2017 Off
Russia-Japan railway bridge would let you travel from London to Tokyo

Russia-Japan railway bridge would let you travel from London to Tokyo

8 October 2017 Off

Tags

AASHTO acad Autocad Beam bim Box Culvert Bridge bridges CAD cad details civil engineering Column concrete construction Culvert drawing dwg Etabs Excel Sheet Footing foundation foundation design Free dwg geotechnical geotechnical engineering highway lidar pavement pile piles pmp project management reinforced concrete retaining wall Road seismic SLAB soil mechanics Spreadsheet spreadsheets STEEL structural analysis Structural Engineering tank water tank
error: Content is protected !!